Was water treatment plant in Palasa beach
WASTE WATER TREATMENT PLANT IN PALASA BEACH
Project: WASTE WATER TREATMENT PLANT IN PALASA BEACH
Investor: “AKUM”
Execution timetable: 2020
Total cost: 1.113.000 Euro
WASTE WATER TREATMENT PLANT IN PALASA BEACH
Project: WASTE WATER TREATMENT PLANT IN PALASA BEACH
Investor: “AKUM”
Execution timetable: 2020
Total cost: 1.113.000 Euro