Construction of dual 20KV substation
CONSTRUCTION OF A DUAL 20KV HIMARA-QEPARO-BORSH-BUNEC
Project: CONSTRUCTION OF A DUAL 20KV HIMARA-QEPARO-BORSH-BUNEC OVERHEAD LINE, CONSTRUCTION OF ELECTRIC CABS AND THE ABC TRANSMISSION LINE (LOT I)
Investor: OSHEE
Execution timetable: 2017
Total cost: 2.900.000 Euro